Steply

Ravi can tile a floor in 10 hours. Dev can tile it in 40 hours. How…

Step by step, with the reason for every step · Work-rate · Algebra 1

Step by step

The question

Question: Ravi can tile a floor in 10 hours.

Dev can tile it in 40 hours.

How many hours will it take them to tile it together?

1 Find what we know

What do we know?

Ravi does the whole job alone in 10 hours.

Dev does it alone in 40 hours.

What do we want?

How long it takes them together.

2 Name the unknown

We don't know how long it takes together.

So we call it x hours.

x = hours together

Careful!

Many people add the times: 50 hours.

But two working together are faster than one.

So together it takes less than 10 hours.

Careful: not 10 + 40 = 50 hours ✗

The whole floor is 1 whole job.

We split it into parts.

Let's put it in a table: the time alone, and the part done.

Ravi does the whole job in 10 hours.

So in 1 hour, Ravi does 1 part out of 10.

That is 1/10.

Dev does 1 part out of 40 in 1 hour: 1/40.

In x hours, Ravi does x times as much: x/10.

And Dev does x/40.

3 Write the equation

In words: Ravi's part plus Dev's part makes the whole job.

x10 + x40 = 1

So the equation is x/10 + x/40 = 1.

Now we solve it.

x10 + x40 = 1

4 Remove the fractions

The bottom numbers are 10 and 40.

40 can be divided by all of them.

We multiply every part by 40.

We do it on both sides, so they stay equal.

40 × x10 + 40 × x40 = 40 × 1

40 divided by 10 is 4.

40 divided by 40 is 1.

Write what is left.

4 × x + x = 40 × 1

Do the multiplications.

No more fractions!

4x + x = 40

5 Group like terms

Terms are the parts between the + and − signs.

Like terms are the same kind: same letters, same powers.

All the x terms go together.

4x + x = 5x.

4x + x = 5x

Now we have 5x = 40.

5x = 40

6 Remove the 5

5x means 5 times x.

We want just x.

To remove times 5, we divide by 5.

We do it on both sides, so they stay equal.

5x5 = 405

5 divided by 5 is 1.

So just x is left.

40 divided by 5 is 8.

405 = 8

So x = 8!

x = 8

7 Answer the question

So together it takes 8 hours.

8 Check

Let's check in the story.

In 8 hours, Ravi does 8/10.

That is 4/5 of the floor.

Ravi: 810 = 45 of the floor

In 8 hours, Dev does 8/40.

That is 1/5 of the floor.

Dev: 840 = 15 of the floor

Together: 4/5 plus 1/5 is 5/5.

That is 1 whole floor, like the story says.

45 + 15 = 55 = 1

Does it make sense?

Together is faster than Ravi alone, who needs 10 hours.

So the answer is right!

makes sense: 8 hours < 10 hours: faster than Ravi alone

Let's look back.

First: find what we know.

Then: name the unknown.

Then: write the equation.

Then: solve it.

Then: answer the question.

Last: check.

Answer
x = 8

Your turn

Try this one yourself, then check:

Show the answer
5 hours

More from Work-rate

The whole lesson: Work-rate →